Font
Large
Medium
Small
Night
PrevPage Index    Favorite Next

Chapter 548 370 million degrees/day(2/2)

In a moment,

A large amount of current flows into the large amount of [MFSU power storage box] in the power storage chamber along the wires.

Shenjin can see through the meter that the peak of power at this moment reached 110 million kWh per hour.

It's really scary!

On the beach at Home 1,

Under the impact of seawater, the rotor inside is constantly washed away and converted into electrical energy through kinetic energy.

Although there are few, 400,000 units of electricity are concentrated together, which is a very large amount of electricity. It is transported along the high-voltage line to the sinking power storage room.

The roofs of each building at Home 1 are filled with rows of densely-paved ordinary [solar generators].

At this time, the sun is just right, and the power generation value of the [Solar Generator] is at the peak of power. They are also connected together along the newly built wire network and transmitted to the sinking power storage room, bringing a large amount of power supply to sinking.

These are just small machines that can generate about 10 kWh of electricity per hour, but in large quantities, they have even surpassed wind power generation.

Shen Jin has installed a system-produced [power meter] on the high-voltage wires from various channels. You can see how much real-time current is in each wire, and calculate the approximate power generation in a day based on their machine properties.

10 nuclear power plants: 190 million degrees/day;

1,000 wind power stations: 70 million degrees/day;

100,000 [Solar generators]: 0.1 million degrees/day;

300,000 [hydrogen generators]: 90 million degrees/day;

1 [Quantum solar generator]: 0.1 million degrees/day;

Total power generation: 370 million kWh per day.

The current storage capacity of the power storage chamber is: 41/2 billion kWh.

The entire power storage room consists of 500 [MFSU power storage boxes], and each power storage is 4 million kWh.

Building this power storage chamber costs a lot of materials to sink, the most important of which is [diamond].

Making a [MFSU power storage box] requires 40 [diamonds],

A total of 20,000 [diamonds] were consumed!

This will kill Chen Jin.

He used up almost all his inventory, and now he has to arrange two [molecular recombinatorial instruments] to make [diamonds] every day.

The machines in the [Advanced Industrial] and [Advanced Solar] expansion modules cost a lot of [diamonds].

If it is made entirely by electricity, the sinking power will be wasted a lot.

Making a diamond costs 900,000 kilowatt-hours of electricity!

Chen Jin now uses all the 370 million kWh of electricity to make [diamonds] every day, and only 411 pieces can be made!

It's just a robbery!

If he uses these electricity to make quantum armor, he can produce 2.5 sets per day!

And to make a [quantum solar generator], you can only get one out in 3 days!

wrong!

When Shenjing calculated the electricity needed to calculate the [quantum solar generator], the electricity used to make [diamond] was also calculated. If the electricity cost of [diamond] was abandoned, it would not take 1 billion kilowatt-hours to make a [quantum solar generator].

One can be released in more than two days.
Chapter completed!
PrevPage Index    Favorite Next